China Resources Anda No. 1 and No. 2 Solar Power Generation Project is located about 18km southwest of Anda City, Heilongjiang Province, and covers an area of 1,279,183 square meters. The current capacity is 40 MW for this phase. Invested and constructed by China Resources New Energy (Anda) Co., Ltd., the construction of this project started in March 2017, and all of them were connected to the grid for power generation on June 30 of the same year.
The photovoltaic panels used in the photovoltaic area are high-efficiency monocrystalline modules. Adjustable brackets were used and PHC pipe piles were used for the foundation. Each square array is 1.25MW and is divided into 32 photovoltaic square arrays. A 220KV booster station is constructed in the same period and was concentrated and networked..
The booster station complex building, equipment foundation, etc. all adopt the construction technology of fair-faced concrete. The structural section size is accurate, and the internal appearance is solid. The construction of PHC pipe piles in the photovoltaic area is horizontal and vertical. The photovoltaic support is flat and accurate, the ends of the beams are flat and neat, and the inclined beams are flat. The combiner box is installed at the same height, the wiring harness is laid reasonably, the plugging is tight, and the marking is complete. The DC cables of the photovoltaic panel are evenly spaced and tied tightly. The DC cables entering the combiner box have the same bending radian with neat arrangement and beautiful wiring. The installation of the main transformer meets the requirements of the specification, and the test results are excellent. The appearance is clean and pollution-free. The power distribution cabinet is securely installed and neatly arranged. The installation position of the box and inverter is accurate, firm and reliable.